摘要: 为改善农村煤改电地区设备利用效率低的问题,并兼顾供电可靠性,提出一种适应季节性负荷的配电变压器与台区线路优化规划方法。主要思路是建立配变间低压联络线,根据季节性负荷特点,通过联络线开关状态变化,转换运行方式,使部分配变低负荷季节退出运行。以综合费用最小为目标构建配电变压器网络双层规划模型,上层采用Voronoi法规划配电变压器,下层采用Prim算法规划低压供电线路,并结合遗传算法进行优化求解。最后,通过对典型供电区域进行配变规划验证了该方法的可行性,并且能够降低配变损耗,提高供电的可靠性和经济性。
Abstract: Taking into account power supply reliability, this paper proposed an optimal planning method adapting to seasonal load for distribution transformer network in order to improve equipment utilization efficiency in rural coal-to-electricity conversion areas. The main idea was firstly to establish low-voltage tie-line between distribution transformers, and according to seasonal load characteristics, some distribution transformers could withdraw from operation in low-load season by switching the tie-line operation state and mode. In this method, a bi-level programming model of distribution transformer network was constructed to minimize the overall cost. Voronoi method was used to plan the distribution transformer at the upper level; Prim algorithm was used to plan the low-voltage power supply line at the lower level, and genetic algorithm was used to seek the optimal solution. Finally, the feasibility of the method was verified by the distribution planning of typical power supply areas, and it can reduce the distribution transformer loss and improve the reliability and economy of power supply.
图 1 配电变压器网络优化规划流程图
Figure 1. Flowchart of distribution transformer network planning optimization
图 2 某D类配电变压器网络优化规划方案图
Figure 2. Optimal planning of a class D distribution transformer network
图 3 某D类配电变压器网络冬季运行图
Figure 3. Winter operational diagram of a class D distribution transformer network
图 4 某D类配电变压器网络春夏秋季运行图
Figure 4. Spring, summer and autumn operational diagram of a class D distribution transformer network
表 1 配电变压器网络规划方案表
Table 1 Distribution Transformer Network Planning Schemes
编号 1 2 3 4 5 各项费用/万元 容量/kVA 315 400 400 315 200 29.388 横坐标 114 224 343 338 322 — 纵坐标 212 319 177 400 130 春夏秋季是否运行 否 否 是 否 否 — 低压线路长度/m(个数/条) 190.9(4) 173(5) 339.8(5) 120(3) 140.8(2) 32.406 联络线长度/m (个数/条) — — 691(4) — — 1.733 总费用 — — — — — 63.527表 2 冬季配电变压器运行情况参数表
Table 2 Parameters of distribution transformer operation in winter
编号 容量/kVA 负荷/kW 运行效率/% 空载损耗/W 负载损耗/W 1 315 162.324 69.68 480 1 243.82 2 400 228.456 77.23 560 2 119.36 3 200 108.216 73.16 340 928.95 4 315 156.312 67.10 480 1 358.02 5 400 192.384 65.03 560 1 502.92表 3 春夏秋季配电变压器运行情况参数表
Table 3 Parameters of distribution transformer operation in spring, summer and Autumn
编号 容量/kVA 负荷/kW 运行效率/% 空载损耗/W 负载损耗/W 3 200 96.162 66.12 340 758.554表 4 方案建设费用明细对比表
Table 4 Detailed comparisons of construction costs between different schemes
费用名称 单位 灵活切换方案 调容配变器方案 传统方案 配电变压器 万元 2.351 2.51 2.351 联络线 万元 0.139 0 0 低压线路 万元 2.592 2.592 2.592 配变损耗冬季 万元 0.940 8 0.940 8 0.980 8 配变损耗春夏秋季 万元 0.152 2 0.223 2 0.512 2 线路损耗 元 0.128 0.128 0.128 总费用 万元 6.175 6.266 6.396 国务院. 乡村振兴战略规划(2018-2022年)[R]. 北京: 中央农村工作领导小组办公室, 2018. 国家发展改革委国家能源局. 电力发展“十三五”规划(2016-2020年)[R]. 北京: 国家发展改革委国家能源局, 2016. 王剑晓, 钟海旺, 夏清, 等. 基于成本-效益分析的温控负荷需求响应模型与方法[J]. 电力系统自动化,2016,40(5):45 − 53. doi: 10.7500/AEPS20150521009WANG Jianxiao, ZHONG Haiwang, XIA Qing, et al. Model and method of demand response for thermostatically controlled load based on cost-benefit analysis[J]. Automation of Electric Power Systems,2016,40(5):45 − 53(in Chinese). doi: 10.7500/AEPS20150521009
EL-FOULY T H M, ZEINELDIN H H, EL-SAADANY E F, et al. A new optimization model for distribution substation siting, sizing, and timing[J]. International Journal of Electrical Power and Energy Systems,2008,30(5):308 − 315. doi: 10.1016/j.ijepes.2007.10.002
汪臻, 盛四清, 周庆捷. 不确定环境下配电网变电站选址定容[J]. 电力建设,2014,35(3):59 − 63. doi: 10.3969/j.issn.1000-7229.2014.03.011WANG Zhen, SHENG Siqing, ZHOU Qingjie. Substation locating and sizing for distribution network in uncertain environment[J]. Electric Power Construction,2014,35(3):59 − 63(in Chinese). doi: 10.3969/j.issn.1000-7229.2014.03.011
杨文宇, 刘健. 配电网架的多阶段不确定性规划[J]. 电工技术学报,2006, 21 (6):89 − 95. doi: 10.3321/j.issn:1000-6753.2006.06.017YANG Wenyu, LIU Jian. Distribution network multi-stage planning considering uncertainty[J]. Transactions of China Electrotechnical Society,2006, 21 (6):89 − 95(in Chinese). doi: 10.3321/j.issn:1000-6753.2006.06.017
寇凌峰, 梁英, 王金丽, 等. 计及负荷增长风险的配电变压器选型方法[J]. 电网技术,2015,39(5):1384 − 1389.KOU Lingfeng, LIANG Ying, WANG Jinli, et al. A type selection method for distribution transformers considering risk of load growth[J]. Power System Technology,2015,39(5):1384 − 1389(in Chinese).
范闻博, 韩筛根. 有载调容变压器安全经济运行控制策略[J]. 电力系统自动化,2011,35(18):98 − 102, 107.FAN Wenbo, HAN Shaigen. A control strategy for secure and economic operation of on-load capacity regulating transformer[J]. Automation of Electric Power Systems,2011,35(18):98 − 102, 107(in Chinese).
王金丽, 盛万兴, 方恒福, 等. 自适应负荷型配电变压器设计[J]. 电力系统自动化,2014,38(18):86 − 92, 119. doi: 10.7500/AEPS20140208002WANG Jinli, SHENG Wanxing, FANG Hengfu, et al. Design of a self-adaptive distribution transformer[J]. Automation of Electric Power Systems,2014,38(18):86 − 92, 119(in Chinese). doi: 10.7500/AEPS20140208002
苏宇, 王强钢, 雷超, 等. 电能替代下的城市配电网有载调容配电变压器规划方法[J]. 电工技术学报,2009,34(7):1490 − 1504. doi: 10.19595/j.cnki.1000-6753.tces.180448SU Yu, WANG Qianggang, LEI Chao, et al. A planning method of on-load capacity regulating distribution transformers in urban distribution network after electric energy substitution[J]. Transactions of China Electrotechnical Society,2009,34(7):1490 − 1504(in Chinese). doi: 10.19595/j.cnki.1000-6753.tces.180448
WANG J , SHENGg W , WANG L , et al. Study on technical and economical efficiency of amorphous alloy transformer and on-load capacity regulating transformer in distribution network application[C]// China International Conference on Electricity Distribution. Shenzhen: IEEE, 2014.
梁惠施, 程林, 苏剑. 微网的成本效益分析[J]. 中国电机工程学报,2011,31(S1):38 − 44.LIANG Huishi, CHENG Lin, SU Jian. Cost benefit analysis for microgrid[J]. Transactions of China Electrotechnical Society,2011,31(S1):38 − 44(in Chinese).
刘斌, 岳青, 孙毅卫, 等. 调容调压变压器现状及发展趋势研究[J]. 变压器,2015,52(5):23 − 28.LIU Bin, YUE Qing, SUN Yiwei, et al. Research on present situation and trend of capacity regulating transformer[J]. Transformer,2015,52(5):23 − 28(in Chinese).
葛少云, 张有为, 刘洪, 等. 考虑网架动态重构的主动配电网双层扩展规划[J]. 电网技术,2018,42(5):1526 − 1536.GE Shaoyun, ZHANG Youwei, LIU Hong, et al. Bi-layer expansion programming method for active distribution network considering dynamic grid reconfiguration[J]. Power Grid Technology,2018,42(5):1526 − 1536(in Chinese).
马丽叶, 王玉翠, 王楚通. 主动配电网中计及网络重构的分布式电源鲁棒规划[J]. 电力系统自动化,2018,42(11):94 − 101. doi: 10.7500/AEPS20171228011MA Liye, WANG Yucui, WANG Chutong. Robust planning of distributed power supply considering network reconfiguration in active distribution network[J]. Power System Automation,2018,42(11):94 − 101(in Chinese). doi: 10.7500/AEPS20171228011
中国电力科学研究院, 国家电网公司. DL/T 5729-2016, 配电网规划设计技术导则[S] . 北京: 中国电力出版社, 2016相关知识
DB22∕T 2978
新新花园住宅小区建设项目立项环境影响评估报告表.doc文档全文免费阅读、在线看
一种配电线路的灌木修剪器的制作方法
季节性储能——未来高比例可再生能源电力系统必备技术
设计美学之我见【建筑电气设计中的若干问题之我见】.docx
重庆室外景观配电系统维护「景荟环境科技供应」
园林专业景观照明工程设计的心得.docx
1W字干货,码住收藏!福建某充电站超完整详细站点设计方案
PMS2.0系统设备查询统计模块查询配电变压器时,过滤条件中手动填写的字段是(
绿色建造与智能建筑范文
网址: 适应季节性负荷的配电变压器与台区线路协调规划方法 https://m.huajiangbk.com/newsview1221645.html
上一篇: 高级公路养护工复习资料 |
下一篇: 季节性冻融作用对土壤理化与微生物 |